Planning Approval for Refurbishment of Offices and Boathouse

Design of New Tourism Accommodation

Drainage assessments for foul and surface water for planning and building control applications

We undertake drainage assessments for both foul and surface water for proposed single dwellings without access to a drainage network to support planning/building control applications.

Environmental Statement to meet the requirements of gas pipeline operator

Provision of an Environmental Statement for a pipeline connection between an AD plant under construction and an existing natural gas pipeline to meet the requirements of the main gas pipeline operator.

Design of New Headquarters Building

Delivery of technical consultancy services to meet planning and/or environmental requirements

Delivery of technical consultancy services to Centrica Business Solutions to meet planning and/or environmental requirements for the installation of CHP plants, battery storage and solar PV arrays.

Design of Residential and Retail Development

SECR submission for STV

We prepared the Streamlined Energy and Carbon Reporting (SECR) submission for STV’s first SECR return in 2020. 

Technical Services to support with Planning Applications

Mabbett are included on Graham + Sibbald network of specialist consultants providing technical and complimentary services to support with planning applications.

Site Specific DSEAR Risk Assessment and Awareness Training

Mabbett supports Glanbia Cheese Ltd with achieving DSEAR compliance and protecting staff from the risks posed by dangerous substances

Design of New Tyre Fitting Depot

Ailsa Craig Granite Extraction Ecological Clerk of Works Support

Ecological Clerk of Work (ECoW) to fulfil planning conditions during granite extraction, erection of bridges and welfare accommodation at Ailsa Craig island. Ailsa Craig is a designated Special Protection Area (SPA) and Site of Special Scientific Interest (SSSI) for its seabird and invertebrate communities.

Hotel Function Room Extension

Environmental Due Diligence Support to Inform Site Acquisitions

Our contaminated land team provided environmental due diligence support to inform various site acquisitions. These assessments were designed to meet client specific requirements for reporting to ASTM E1527 standards.

Design of Purpose-Built Equine Vet Practice

Green Apple Award for Environmental Best Practice

Mabbett acted as a sub-consultant to Morgan Sindall Infrastructure on the award-winning Boat of Garten to Nethy Bridge VISTA project in the north of Scotland, delivering a Construction Environment Management Plan (CEMP) and Ecological Clerk of Works (ECoW) for the installation of underground cabling in a rural environment. The project won the Green Apple Award for Environmental Best Practice

Gibraltar shipyard achieves ISO 9001 and ISO 14001

Gibdock achieves transition to ISO 9001:2015 and ISO 14001:2015 with zero non-conformances at external audit.

Drainage Assessments for HebHomes

We undertake drainage assessments for both foul and surface water for proposed dwellings to support planning/building control applications.

Bord Bia Origin Green Programme Third-Party Verification Partner

We have a critical responsibility in ensuring that members of the programme continue to meet expectations and that information is accurate and credible.

Design of Parcel Distribution Centre