£200,000 annual savings for Stratheden and Lynebank hospitals

Istock_000032137272large_square

Mabbett Project Approach and Delivery:

NHS Fife applied for funding from Health Facilities Scotland through the Carbon Reduction Programme to replace existing steam boilers with new, high-efficiency gas-fired boilers. Mabbett, who are Resource Efficient Scotland framework contractors, were commissioned to conduct energy surveys at both sites. These took into account the layout of the site, the energy demand profile, potential development at the site, and other local options or opportunities for energy generation. The resulting outcome of the energy surveys decided that the best option was to decentralise the existing boiler plants at both hospitals. The existing steam boilers were replaced with high-efficiency gas-fired boilers and this has yielded a great saving.

Project Outcomes:

  • Annual savings of around £200,000 across both sites.
  • Gas consumption reduced by around 35%.
  • Carbon emissions reduced by 1,200 tCO2e.

Click here to visit the Resource Efficient Scotland website to read the full project case study.

To find out more about how our technical energy team can support your company or organisation, please contact Andy Lee, Director, Engineering, on lee@mabbett.eu; 0141 227 2300.